Southern California
Barren Ridge Renewable Transmission Line
Location







Project Details
Gothic was responsible for the post-construction revegetation and restoration of a new 68-mile transmission line that consists of working both in the desert and in the Angeles National Forest (ANF). The scope of work included hydroseeding, weed abatement (manual and herbicide application), soil stabilizer, BMP’s and maintenance. All BMP work is directed by Gothic’s Qualified Stormwater Practitioner (QSP) and in compliance of SWPPP (Storm Water Pollution Prevention Plan).

Your success is our success